Technical retrofitting and upgrading of existing isolators
Regulatory conformity
Adjustment to current legal requirements
Extended isolator service life
Modernization and extended service life by several years
Increased reliability
Reduction of unplanned downtime
Efficient implementation
Minimized downtime through rapid recommissioning
Process stability
Existing production processes are retained
Future-proofing
Preparation for future requirements
Greater sustainability
Measures for optimized energy consumption
Manufacturer expertise
Complete implementation by SKAN as system manufacturer
Application
Service life extension and adaptation to new requirements
For systems that have been in use for many years
Suitable for isolators whose components, automation, or operating concepts no longer meet current technical or regulatory standards. Retrofits bring existing systems up to the current state of the art in a targeted manner.
Following regulatory or technical changes
When regulations, user specifications, or internal standards are updated, upgrades ensure that existing production systems can continue to operate efficiently in line with legal requirements.
To safeguard existing production processes
Retrofit measures enable the maintenance of existing production volumes and, in many cases, delay costly process re-qualifications.
Process
Structured process from analysis to implementation
1
Analysis of the initial situation
Assessment of the current installation condition, the components used, as well as identified risks and obsolescences.
2
Definition of the retrofit scope
Joint stipulation of the measures, priorities, and objectives based on a technical and risk-based analysis.
3
Technical planning
Elaboration of the retrofit or upgrade concept including adjustments to hardware, software, and automation.
4
Implementation of measures
Execution of the agreed-upon measures by SKAN service and engineering teams on-site at your facility. Dismantling of the system and implementation at SKAN is also possible.
5
Documentation and qualification
Updating of the technical documentation and implementation of necessary qualification activities.
6
Conclusion and handover
Final discussion, handover of the updated documentation, and approval of the modernized installation.
Service highlights
Sustainable modernization
Delaying new investments
Retrofits and upgrades delay the need for costly replacement systems and continue to use existing investment optimally.
Minimized downtime
Through structured planning and targeted implementation, production interruptions are kept to an absolute minimum.
Holistic implementation
SKAN handles the entire process, from analysis and project management to qualification and documentation.