Skip to content
Person in Schutzkleidung
Sterility assurance
  • On-site

Cycle transfer and performance test

Safely transfer and validate proven cycles to new isolators

Service area
Biodecontamination & process validation
Lifecycle
Operation
Cycle transfer and performance test at a glance

Efficiently transfer and validate cycles

  • No need for new development

    With successful cycle transfer, validation of established parameters instead of completely new approach

  • Rapid implementation

    On-site tests reduce downtime

  • Compliant with regulatory requirements

    Solid proof for audits and inspections

  • Tried-and-tested processes

    Standardized methodology with proven tools and BIs

  • Detailed documentation

    Master documents, forms, photo‑based documentation protocols, final report

  • SKAN expertise on-site

    Expert support and guidance with unexpected events

  • Manufacturer-independent

    Can be performed on all isolators with a decontamination system

  • Flexible adaptation possible

    Parameters can be adjusted specifically where necessary

Application

Regulatory-compliant parameter transfer

  • For pharmaceutical and biotech production

    Manufacturers of sterile pharmaceuticals who operate multiple isolators of the same design with identical loading and processes, or who are relocating facilities. Cycle transfer enables safe operation without the need for new cycle development.

  • For ATMP and cell therapy production

    Small-volume, highly sensitive production with frequently changing loads. New loading patterns can be introduced in a targeted and regulatory-compliant manner.

  • For engineering and qualification teams

    Those responsible for commissioning, requalification, or modifications to existing systems. Minimizes time and risks associated with site or layout changes.

Isolator mit Inhalt
Process

Structured workflow for reliable results

  • 1

    Requirements analysis

    Joint clarification of individual specifications and framework conditions, such as type and positioning of the biological indicators (BI) as well as the planned loading.

  • 2

    Creation of test documentation

    SKAN creates the test schedules and documents and obtains your approval before the actual tests begin.

  • 3

    On-site performance of the tests

    Multiple consecutive test cycles are performed directly on the isolator, including monitoring, BI analysis, and logging.

  • 4

    Evaluation

    Analysis of the results.

  • 5

    Final documentation and approval

    Creation of a complete documentation package with all protocols, images, and a final report for approval.

Service highlights

Efficiency and safety for your decontamination cycle

  • Back in production faster

    No need for a complete redesign and production downtime is kept to a minimum.

  • Regulatory compliance

    Tests and documentation meet regulatory requirements and provide robust evidence for audits and inspections.

  • Manufacturer-independent

    SKAN services can be performed on isolators from any manufacturer equipped with H₂O₂ decontamination systems.

Person mit Handschuhen

Technical specifications

  • Cycle Transfer (CT)

    Transfer of existing, validated cycle parameters to identically constructed isolators

  • Cycle Performance Test (CPT)

    Confirmation of cycle effectiveness following relocation or modification

  • Options

    E.g., definition of loading patterns, worst-case positions, temperature and humidity mapping, CI mapping, enzyme indicator mapping

  • Study

    On-site execution of test cycles on isolator

  • Data

    BI evaluations

  • Documentation

    Master documents, approval, test, and image reports, summary final report

FAQs

  • If an existing, validated decontamination cycle is to be transferred to a structurally identical isolator or a new loading pattern is to be qualified.

  • If an isolator has to be requalified after a relocation or room change to confirm the effectiveness of the existing validated cycle parameters.

  • With a cycle development, parameters are redefined from the ground up. With the cycle transfer/cycle performance test, existing parameters are simply verified.

  • The duration depends on the scope and the number of test cycles. As a rule, a couple of days on-site are required to perform the test, after which the documentation is created.

  • No. The tests can be performed on all isolators with H₂O₂ decontamination systems, irrespective of the manufacturer.

Get in touch!

Whether you have a question about our products, need technical support or would like to find out more about our solutions.

Back to top