Isolator technology

Grade A where the process takes place

Learn more

People are the greatest source of contamination in the cleanroom. Isolators physically separate them from the process – creating Grade A precisely where the product is exposed.

In aseptic manufacturing, isolators are now the preferred solution in many places: regulatory guidelines such as EU GMP Annex 1 favor barrier systems, and new therapies and highly potent APIs require both product and operator protection. There is also an economic advantage: Grade A is required only inside the isolator, so the surrounding room can have a significantly lower classification – with correspondingly lower costs for HVAC, energy, and gowning.

This article walks through the functional areas of an isolator – from pressure regime and airflow to access and transfer to leak testing and control – and shows which design decisions lead to a successful project.

How an isolator ensures Grade A

The operating principle

  • Physical barrier

    A sealed enclosure made of stainless steel and glass completely separates the process from the operator.

  • Dedicated air handling

    Terminal HEPA filters and an airflow system separate from the room keep the work area low in particles and microorganisms.

  • Controlled differential pressure

    Positive pressure protects the product; negative pressure protects personnel and the environment.

  • Automated bio-decontamination

    A validated, reproducible H₂O₂ cycle inactivates microorganisms on all relevant surfaces.

What the isolator protects – and from what

Pressure regime and direction of protection

  • The first design decision concerns the direction of protection. It determines the leak-tightness requirements, transfer concept, and filter technology of the entire system – and therefore belongs at the very start of planning. 

  • Positive pressure: aseptic isolators

    If a leak occurs, air flows outward. The product remains protected. The operator is protected primarily by the barrier itself.

  • Negative pressure: containment isolators

    For highly potent, cytotoxic, allergenic, or teratogenic substances, the isolator replaces the full protective suit. A leak draws air into the system.

  • Sterile and highly potent: the most demanding case

    Product protection requires positive pressure; operator protection requires negative pressure. The solution lies in cascaded pressure zones, suitable airlock and transfer concepts, and safe-change filters.

Front view of a SKAN "spectra" versatile laboratory isolator. The stainless steel unit features a control touchscreen, two workstations with glass viewing panels, and integrated glove ports for sterile lab work.
Isolator or RABS?

Which system fits your process

Whether an isolator or a RABS is the right choice depends on the product, process, batch size, and operating concept – and on how capital and operating costs are distributed over the life cycle. We compare both systems, from Annex 1 requirements to cost-effectiveness.

Go to the decision guide
Technology

Understanding Grade A – technologies for aseptic processes

Hotspot image
  • Operators using flexible FlexFill modules.

    Isolator or RABS?

    How the two systems compare on requirements, operation and cost of ownership.

    Details anzeigen
  • H₂O₂ decontamination

    How H₂O₂ inactivates microorganisms and how the efficacy of a cycle is demonstrated.

    Details anzeigen
  • Filters

    How HEPA filters work and how their integrity is tested once installed.

    Details anzeigen
  • Close up of catalytic converter surface

    Catalysts

    How catalysts break down H₂O₂ after decontamination and shorten aeration times.

    Details anzeigen
What happens at every campaign start

The isolator in operation

Hotspot image
  • Cleaning

    Residues can inhibit the efficacy of bio-decontamination. The isolator is therefore cleaned using a validated procedure before every cycle.

  • Loading

    Materials are cleaned and disinfected in advance and introduced according to validated loading patterns: with sufficient spacing, without touching each other, and without folds. Whatever the decontamination agent cannot reach will not be decontaminated.

  • H₂O₂ decontamination

    The automated cycle runs through pre-conditioning, conditioning, and decontamination. H₂O₂ is effective against a broad range of microorganisms, including spores, and decomposes into water and oxygen. [Link: H₂O₂ decontamination]

  • Aeration

    The H₂O₂ concentration is reduced to the defined limit. Materials that absorb H₂O₂ and release it only slowly noticeably extend this phase. Catalysts shorten it. [Link: Catalysts]

  • Aseptic processing

    Only now does production begin – under Grade A conditions and with continuous monitoring.

Key decisions

In many projects, the factors that determine operating costs, changeover times, and availability are not discussed until the design is complete. By then, ergonomics, the transfer concept, material selection, and the cycle’s safety margin can only be corrected at great expense – or not at all. We consider this the most important avoidable mistake in isolator projects.

Three points should therefore be addressed before design begins.

The ergonomics study.
A mock-up with the future operators clarifies glove positions, reach, transfer systems, and workflows. At this stage, doors, mouseholes, dosing systems, and instrumentation must still be freely movable.

The cycle’s safety margin.
A cycle that is only just sufficient leaves no buffer for normal variability in the process, the indicators, and the condition of the system.

The cleanability of internal fixtures.
What cannot be cleaned cannot be reliably decontaminated.

One observation from practice adds to this: the automated decontamination cycle is the most reproducible part of the system. When sterility issues occur, the cause more often lies in recontamination – via transfer paths, material preparation, or bioburden before loading. This, too, is a question of concept, not execution.

How an isolator is qualified

  • User Requirement Specification (URS)
  • Validation master plan
  • Risk analyses
  • Mock-up and ergonomics study
  • Factory Acceptance Test (FAT)
  • Design Qualification (DQ)
  • Installation Qualification (IQ)
  • Operational Qualification (OQ): differential pressure, air velocity, HEPA integrity test, cleanliness class, airflow visualization
  • Cycle development
  • Microbiological qualification with biological indicators
  • Performance Qualification (PQ)
  • Aseptic Process Simulation (APS, Media Fill)

Frequently asked questions:

  • That depends on the design and the application. For aseptic manufacturing, Annex 1 requires at least Grade D for closed isolators and at least Grade C for open isolators. For sterility testing isolators, a controlled, unclassified environment is often sufficient. At a minimum, authorities expect controlled access, controlled room temperature, a defined air change rate, a suitable exhaust system, and room monitoring.

  • Gloves are regularly tested for leak-tightness, both visually and with pressure testing devices. Annex 1 requires testing at least at the beginning and end of each batch or campaign. Change intervals are defined by the operator on a risk basis – depending on the material, intensity of use, and process. A glove change must be followed by renewed proof of leak-tightness.

  • In principle, yes – but only within the scope of the original design. Chamber size, pressure regime, and transfer concept can hardly be changed after the fact. Change parts, internal fixtures, and software, on the other hand, can. Every change must be assessed and, if necessary, requalified. If you can anticipate future products, you should therefore take them into account in the URS. Modular concepts make later adaptations easier.

  • Even though the isolator separates people from the process, aseptic behavior remains critical: calm, controlled glove interventions, correct material preparation, and adherence to loading patterns. Operators are trained and qualified for this and regularly participate in the Aseptic Process Simulation (Media Fill). An early ergonomics study using the mock-up also makes training easier later on.

Where isolators are heading

Outlook

  • H₂O₂ decontamination spray

    Shorter cycles

    The bottleneck in modern isolator systems is changeover time. Spray-based H₂O₂ methods and catalysts significantly shorten decontamination and aeration.

  • Internal view of an aseptic isolator featuring a robotic arm and specialized machinery for automated pharmaceutical powder handling in a sterile environment - by SKAN.

    More robotics

    Processes that currently require glove interventions are increasingly being taken over by cleanroom-compatible robots – with lower contamination risk and better operator protection.

  • PSI-L Isolator

    Standardization and modularity

    For clearly defined applications such as sterility testing, aseptic filling of small batches, or clinical trial material, standardized isolators that can be combined modularly are becoming established.